Whether you own a stone cottage or a new-build on the outskirts of Guisborough, our team provides fixed-price surveys and clean, dust-free installations in 1-2 days.
We never compress your thermal insulation. Our approved Loft-E® raised metal system and heavy-duty timber subframes elevate the new floor 270mm above ceiling joists, keeping your heating bills low and avoiding condensation issues.
We are official approved installers of the patented Loft-E® raised metal subframe. Engineered specifically for UK truss roofs and modern deep insulation depths, Loft-E creates an elevated, rock-solid platform that transfers load directly to truss node joints.